WV DOCR Building 84 - Drainage and Paving Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The West Virginia Purchasing Division is soliciting bids on behalf of the General Services Division to establish a contract to replace existing and install new drain inlets and drain lines, clean existing drain lines, perform parking lot repairs, and install asphalt paving and pavement marking at Parking Lot 84 located at 1409 Greenbrier St., Charleston, WV 25301, per the attached documentation.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Raw Materials, Road, Water Supply and Storage, Automotive, Commercial, Government
- Location
- Charleston, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WV DOCR Building 84 - Drainage and Paving Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The West Virginia Purchasing Division is soliciting bids on behalf of the General Services Division to establish a contract to replace existing and install new drain inlets and drain lines, clean existing drain lines, perform parking lot repairs, and install asphalt paving and pavement marking at Parking Lot 84 located at 1409 Greenbrier St., Charleston, WV 25301, per the attached documentation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Raw Materials, Road, Water Supply and Storage, Automotive, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
