WV/DOT: Bridge Improvements (CO 028)
Sector: Bridge • Location: Beckley, West Virginia, United States of America
Source: Dodge USA
Clean and paint the two-lane, two span structure spanning I-77, located 0.10 miles east of CR 19/13. The overall length of the structure is 232.2 feet with a roadway width of 25.9 feet. ADT is 200 (2019). All work will be within the existing right of way. Glade Fork Bridge
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Clean and paint the two-lane, two span structure spanning I-77, located 0.10 miles east of CR 19/13. The overall length of the structure is 232.2 feet with a roadway width of 25.9 feet. ADT is 200 (2019). All work will be within the existing right of way. Glade Fork Bridge |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
