WV/DOT: Roadway Resurfacing (CO 016)
Sector: Road • Location: Bolt, West Virginia, United States of America
Source: Dodge USA
Milling the roadway and resurfacing with 1.5 inches of Skid Pavement for 3.11 miles. Also placing shoulder stone adjacent to the newly resurfaced roadway and replacing guardrail. All work will be within the existing right of way. There will be no tree removal or work below OHW.
- Status
- Closed
- Sector
- Road, Mass Transit, Rail, Commercial, Manufacturing (Industrial)
- Location
- Bolt, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WV/DOT: Roadway Resurfacing (CO 016)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Milling the roadway and resurfacing with 1.5 inches of Skid Pavement for 3.11 miles. Also placing shoulder stone adjacent to the newly resurfaced roadway and replacing guardrail. All work will be within the existing right of way. There will be no tree removal or work below OHW. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Bolt |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Mass Transit, Rail, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
