WWT Facility Effluent Discharge Outfall Diffuser Project
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
Wastewater Treatment Facility Outfall and Diffuser Project. The project consists of modifications to the existing treatment plant effluent pumps, a bifurcation station and flow meter, approximately 2 miles of new outfall pipeline, a levee crossing system (vacuum assisted siphon priming system, priming valve vault, primer trap structure), new diffuser structure in the Feather River bed, an access r
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Yuba City, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WWT Facility Effluent Discharge Outfall Diffuser Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Wastewater Treatment Facility Outfall and Diffuser Project. The project consists of modifications to the existing treatment plant effluent pumps, a bifurcation station and flow meter, approximately 2 miles of new outfall pipeline, a levee crossing system (vacuum assisted siphon priming system, priming valve vault, primer trap structure), new diffuser structure in the Feather River bed, an access ramp over the levee to access the new outfall, new power connections, and acquisition of easements... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Yuba City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
