logo

WWTF Improvement

Sector: Water Supply and Storage • Location: Adelanto, California, United States of America

Source: Dodge

Project
Gc Bidding

This project generally consists of supply, installation and commissioning of new materials and equipment to optimize the City of Adelanto WWTP Engineering and design services for the Tertiary Upgrades to the Adelanto Wastewater Treatment Facility. Project include e, but not be limited to, removing redundant or obsolete equipment, removing equipment pads, removing outdated electrical equipment and

Status
Prospective
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial
Location
Adelanto, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WWTF Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WWTF Improvement” is an infrastructure initiative in the Water Supply and Storage sector, located in Adelanto, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project generally consists of supply, installation and commissioning of new materials and equipment to optimize the City of Adelanto WWTP Engineering and design services for the Tertiary Upgrades to the Adelanto Wastewater Treatment Facility. Project include e, but not be limited to, removing redundant or obsolete equipment, removing equipment pads, removing outdated electrical equipment and cabinets, and removing unused equipment and materials.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Adelanto

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project