WWTP Addition of Redundant Clarification
Sector: Water Supply and Storage • Location: Comanche, Texas, United States of America
Source: Dodge
The project will include the addition of redundant clarification to provide operational flexibility for maintenance and upgrades to the solids handling and dewatering systems to provide alternative solids disposal options at the existing WWTP. The proposed project will also include the development of an asset management plan for the District's wastewater system. Upper Leon River Municipal Water Di
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government, Waste Processing and Treatment, Commercial
- Location
- Comanche, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WWTP Addition of Redundant Clarification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will include the addition of redundant clarification to provide operational flexibility for maintenance and upgrades to the solids handling and dewatering systems to provide alternative solids disposal options at the existing WWTP. The proposed project will also include the development of an asset management plan for the District's wastewater system. Upper Leon River Municipal Water District may be seeking design services for the addition of redundant clarification to provide oper... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Comanche |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
