WWTP and Pumpstation Non-Critical PLC Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope includes replacement of non-critical PLC at the City¶s WWTP and SPS. Replacement of legacy PLC equipment and associated items that areno longer supported and has reached the end of its assetlifecycle. A consultant is required to complete this task. The project has been staged into 2 phases. Phase 1 includes the Raw Sewage (Primary and Backup) PLC and Pretreatment PLC at the WWTP.Phase 2 (SPS
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Government, Commercial, Water Supply and Storage
- Location
- Brantford, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP and Pumpstation Non-Critical PLC Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope includes replacement of non-critical PLC at the City¶s WWTP and SPS. Replacement of legacy PLC equipment and associated items that areno longer supported and has reached the end of its assetlifecycle. A consultant is required to complete this task. The project has been staged into 2 phases. Phase 1 includes the Raw Sewage (Primary and Backup) PLC and Pretreatment PLC at the WWTP.Phase 2 (SPS) includes the Greenwich Street SPS PLC.Estimates and further project details areprovided within... |
Budget |
Location
Country | Canada |
State | Ontario |
City | Brantford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Government, Commercial, Water Supply and Storage |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
