WWTP Blower Replacement
Sector: Steel • Location: Dawson Creek, British Columbia, Canada
Source: Dodge USA
The project consists of the following work: Replace existing blowers with owner supplied 120 HP screw blowers. Remove and replace existing housekeeping pads to accommodate new blower footprints. Modify stainless steel piping to connect blowers into existing system. Run power and controls to new blowers.
- Status
- Prospective
- Sector
- Steel, Water Supply and Storage, Power Generation (CCGT), Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Dawson Creek, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Blower Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the following work: Replace existing blowers with owner supplied 120 HP screw blowers. Remove and replace existing housekeeping pads to accommodate new blower footprints. Modify stainless steel piping to connect blowers into existing system. Run power and controls to new blowers. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Dawson Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Water Supply and Storage, Power Generation (CCGT), Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
