WWTP C3 - Grit Separators Mechanical Services
Sector: Commercial • Location: Richmond, British Columbia, Canada
Source: Dodge USA
The work consists of the installation of two new progressive cavity pumps, in a duty standby configuration, to pump primary effluent from the primary effluent channels to the grit separators in the Solids Handling Building. The C3 piping will be interconnected with the existing C2 piping to enable MV to select water from either source through the plant control system.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Design Development |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work consists of the installation of two new progressive cavity pumps, in a duty standby configuration, to pump primary effluent from the primary effluent channels to the grit separators in the Solids Handling Building. The C3 piping will be interconnected with the existing C2 piping to enable MV to select water from either source through the plant control system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
