WWTP Clarifier Improvements
Sector: Water Supply and Storage • Location: Bowling Green, Ohio, United States of America
Source: Dodge
The project consists of major improvements to the WWTP final clarifiers, including two new 100-foot diameter final clarifiers, flow splitting, additional RAS and WAS pumping equipment, replacement of existing Final Clarifier No 1 and 2 weirs and baffles, additional piping at the aeration tanks for the biological nutrient removal (BNR) process, electrical feeders and controls, and other appurtenanc
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment
- Location
- Bowling Green, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WWTP Clarifier Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of major improvements to the WWTP final clarifiers, including two new 100-foot diameter final clarifiers, flow splitting, additional RAS and WAS pumping equipment, replacement of existing Final Clarifier No 1 and 2 weirs and baffles, additional piping at the aeration tanks for the biological nutrient removal (BNR) process, electrical feeders and controls, and other appurtenances. The pier collector equipment in the two Primary Tanks will also be replaced with this project... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Bowling Green |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
