WWTP Clarifier Structure Coating
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The scope of this project is to professionally surface prep and apply new coating on existing wastewater clarifier rake mechanisms, steel structures, and concrete structures per specifications. The location of this work is the Faulkner Lake and White Oak Water Reclamation Facilities.
- Status
- Closed
- Sector
- Steel, Cement, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial
- Location
- North Little Rock, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Clarifier Structure Coating
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this project is to professionally surface prep and apply new coating on existing wastewater clarifier rake mechanisms, steel structures, and concrete structures per specifications. The location of this work is the Faulkner Lake and White Oak Water Reclamation Facilities. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | North Little Rock |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
