logo
ProjectClosed

WWTP Dewatering Upgrade - Phase 1

Closed · British Columbia · Last reported Feb 2024

Source: Dodge USA

The project comprises Site visit for confirmation of existing infrastructure including but not limited to sizing, dimensions, and bolt patterns. Coordination with Village of Cache Creek staff to drain and refill digester tanks as necessary. Isolate, expose, and remove existing infrastructure including 6.5 m of 100 mm diameter and 150 mm diameter steel piping including valves and appurtenances per

Status
Closed
Sector
Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage
Location
Ashcroft, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WWTP Dewatering Upgrade - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WWTP Dewatering Upgrade - Phase 1” is an infrastructure initiative in the Steel sector, located in Ashcroft, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises Site visit for confirmation of existing infrastructure including but not limited to sizing, dimensions, and bolt patterns. Coordination with Village of Cache Creek staff to drain and refill digester tanks as necessary. Isolate, expose, and remove existing infrastructure including 6.5 m of 100 mm diameter and 150 mm diameter steel piping including valves and appurtenances per removals and operational sequence on drawing 310-041-M10. Supply and install the following in pla...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Ashcroft

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project