WWTP Digester Overflow Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
For the supply and installation of approximately 75m of 250mm PVC pipe to replace the existing digester sludge overflow pipeline at the Wastewater Treatment Plant (WWTP). The Work will include trenching, coring through existing concrete walls, and tying in the new line into the existing digester overflow system. Once the new line is in service, the existing steel line is to be demolished and remov
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal
- Location
- Saskatoon, Saskatchewan, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Digester Overflow Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | For the supply and installation of approximately 75m of 250mm PVC pipe to replace the existing digester sludge overflow pipeline at the Wastewater Treatment Plant (WWTP). The Work will include trenching, coring through existing concrete walls, and tying in the new line into the existing digester overflow system. Once the new line is in service, the existing steel line is to be demolished and removed from site. |
Procurement method |
Location
Country | Canada |
State | Saskatchewan |
City | Saskatoon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
