WWTP Digester Sludge Removal Services
Sector: Water Supply and Storage • Location: Nacogdoches, Texas, United States of America
Source: Dodge USA
Removal of an estimated 5,100 wet tons of sludge from two oxidation ditches at the Nacogdoches Wastewater Treatment Plant (WWTP). Sludge to be pumped from basins to weir tank for settling, then dewatered via mobile belt press. After separation, filtrate will gravity drain to nearby lift station and solids will be hauled off in roll off container to the Nacogdoches Landfill. Provide all equipment a
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Government, Waste Processing and Treatment
- Location
- Nacogdoches, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Digester Sludge Removal Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of an estimated 5,100 wet tons of sludge from two oxidation ditches at the Nacogdoches Wastewater Treatment Plant (WWTP). Sludge to be pumped from basins to weir tank for settling, then dewatered via mobile belt press. After separation, filtrate will gravity drain to nearby lift station and solids will be hauled off in roll off container to the Nacogdoches Landfill. Provide all equipment and labor necessary for services, including for pumping sludge out of each basin, tank for settlin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Nacogdoches |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Government, Waste Processing and Treatment |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
