logo
ProjectClosed

WWTP Effluent Redistribution

Closed · Texas · Last reported Mar 2024

Source: Dodge USA

Furnish and install all necessary materials for a complete, fully automatic, and reliable pumping system for proposed Transfer Pump Station No. 1, Transfer Pump Station No. 2, and Transfer Pump Station No. 3. Work includes but is not limited to intake piping, concrete slab, wet well, pumping station, interconnection piping, pump house, site work, stormwater pollution prevention as indicated on the

Status
Closed
Sector
Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial
Location
Fulshear, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WWTP Effluent Redistribution

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WWTP Effluent Redistribution” is an infrastructure initiative in the Water Supply and Storage sector, located in Fulshear, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Furnish and install all necessary materials for a complete, fully automatic, and reliable pumping system for proposed Transfer Pump Station No. 1, Transfer Pump Station No. 2, and Transfer Pump Station No. 3. Work includes but is not limited to intake piping, concrete slab, wet well, pumping station, interconnection piping, pump house, site work, stormwater pollution prevention as indicated on the drawings, and electrical/instrumentation/controls, supply and installation of an irrigation pump...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Fulshear

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project