WWTP Electrical Service Resiliency & Reliability Improv
Sector: Power Transmission • Location: Clinton, North Carolina, United States of America
Source: Dodge USA
The project consists of upgrades to the existing WWTP electrical service, electrical utility building and underground electrical wiring, including dual standby generators, an automatic transfer switch, and associated switchgear and panels
- Status
- Closed
- Sector
- Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government, Water Supply and Storage
- Location
- Clinton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Electrical Service Resiliency & Reliability Improv
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of upgrades to the existing WWTP electrical service, electrical utility building and underground electrical wiring, including dual standby generators, an automatic transfer switch, and associated switchgear and panels |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government, Water Supply and Storage |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
