WWTP Flood Protection
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
The Project consists of constructing the following: Dike approximately 700 ft long and 2 to 6 ft high Flood wall approximately 100 ft long and 3 to 4 ft high Regrading of gravel road Drainage modification to prevent reverse flow during flood events Relocation of fence and installation of additional fence Lighting
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial, Manufacturing (Industrial)
- Location
- Wallace, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Flood Protection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of constructing the following: Dike approximately 700 ft long and 2 to 6 ft high Flood wall approximately 100 ft long and 3 to 4 ft high Regrading of gravel road Drainage modification to prevent reverse flow during flood events Relocation of fence and installation of additional fence Lighting |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wallace |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
