WWTP Improvement REBID
Gc bidding · North Carolina · Last reported Jul 2024
Source: Dodge USA
The project will consist of thefurnishing of all materials, labor and equipment necessaryto for the removal and disposalof biosolids in the existing 4.8- acre WWTP lagoon, replacement of the automatic stepscreen equipment, replacementof three (3) floating aerators,replacement of one (1) submersible spray field pump, replacement of spray field nozzlesand the replacement of four (4)chemical pumps an
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Chemical (Industrial), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Rich Square, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Improvement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will consist of thefurnishing of all materials, labor and equipment necessaryto for the removal and disposalof biosolids in the existing 4.8- acre WWTP lagoon, replacement of the automatic stepscreen equipment, replacementof three (3) floating aerators,replacement of one (1) submersible spray field pump, replacement of spray field nozzlesand the replacement of four (4)chemical pumps and the associated electrical work |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Rich Square |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Chemical (Industrial), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
