WWTP Improvements - Phase 1 - Secondary Treatment
Sector: Chemical (Industrial) • Location: Plain City, Ohio, United States of America
Source: Dodge USA
The Village of Plain City WWTP is active and meeting permit requirements. The WWTP treats an average daily flow of 0.75 MGD and peak hourly flow of 2.8 MGD. The project consists of an installation of the additional Oxidation Ditch No. 4 and Final Clarifier No. 4. The Village of Plain City WWTP Improvements Project will increase biological treatment operating capacity to Average Daily Flow of 1.25
- Status
- Closed
- Sector
- Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Plain City, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Improvements - Phase 1 - Secondary Treatment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village of Plain City WWTP is active and meeting permit requirements. The WWTP treats an average daily flow of 0.75 MGD and peak hourly flow of 2.8 MGD. The project consists of an installation of the additional Oxidation Ditch No. 4 and Final Clarifier No. 4. The Village of Plain City WWTP Improvements Project will increase biological treatment operating capacity to Average Daily Flow of 1.25 MGD and Peak Hourly of 4.12 MGD. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Plain City |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
