WWTP Improvements Phase 1
Sector: Commercial • Location: Sault Ste. Marie, Michigan, United States of America
Source: Dodge USA
General construction and repair of wastewater treatment facility buildings including work in the Preliminary Treatment, Primary Treatment, Secondary Treatment, the Service Building, the Digester Complex, and the Administration Building. Work also includes construction of a new Chemical Feed Building. Specific trade work includes sitework, yard piping, structural, architectural, process piping and
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- Sault Ste. Marie, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General construction and repair of wastewater treatment facility buildings including work in the Preliminary Treatment, Primary Treatment, Secondary Treatment, the Service Building, the Digester Complex, and the Administration Building. Work also includes construction of a new Chemical Feed Building. Specific trade work includes sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, electrical and instrumentation and control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Sault Ste. Marie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
