logo
ProjectClosed

WWTP Interim Phase Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Construct new aerobic digester facility; convert existing digester basins into aeration basins; replace aeration basin air piping and diffusers; upgrade air blowers; air header modifications; improve blower room ventilation; improve aeration basin routing to allow isolation of clarifier feed channels; improve Clarifier No. 2 RAS transfer line; replace MCC, SCADA, and other electrical equipment; re

Status
Closed
Sector
Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage
Location
Spring, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WWTP Interim Phase Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WWTP Interim Phase Improvements” is an infrastructure initiative in the Commercial sector, located in Spring, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct new aerobic digester facility; convert existing digester basins into aeration basins; replace aeration basin air piping and diffusers; upgrade air blowers; air header modifications; improve blower room ventilation; improve aeration basin routing to allow isolation of clarifier feed channels; improve Clarifier No. 2 RAS transfer line; replace MCC, SCADA, and other electrical equipment; rehabilitate dewatering building structure; replace existing belt filter press with new rotary fan ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Spring

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage

Article published date

2023-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project