WWTP Interim Phase Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construct new aerobic digester facility; convert existing digester basins into aeration basins; replace aeration basin air piping and diffusers; upgrade air blowers; air header modifications; improve blower room ventilation; improve aeration basin routing to allow isolation of clarifier feed channels; improve Clarifier No. 2 RAS transfer line; replace MCC, SCADA, and other electrical equipment; re
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage
- Location
- Spring, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Interim Phase Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct new aerobic digester facility; convert existing digester basins into aeration basins; replace aeration basin air piping and diffusers; upgrade air blowers; air header modifications; improve blower room ventilation; improve aeration basin routing to allow isolation of clarifier feed channels; improve Clarifier No. 2 RAS transfer line; replace MCC, SCADA, and other electrical equipment; rehabilitate dewatering building structure; replace existing belt filter press with new rotary fan ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Spring |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
