WWTP Levee Improvements Phase 2
Sector: Waste Processing and Treatment • Location: Austin, Minnesota, United States of America
Source: Dodge
Over the years during flood events, levees have been built at the Wastewater Treatment Plant (WWTP). The levees have been built of miscellaneous soils as emergency measures. This project will evaluate the existing levees, and make the necessary improvements to upgrade the levees to meet FEMA standards. The total estimated cost of the project is $8,000,000 and would be completed in 2-phases. Phase
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Austin, Minnesota, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WWTP Levee Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Over the years during flood events, levees have been built at the Wastewater Treatment Plant (WWTP). The levees have been built of miscellaneous soils as emergency measures. This project will evaluate the existing levees, and make the necessary improvements to upgrade the levees to meet FEMA standards. The total estimated cost of the project is $8,000,000 and would be completed in 2-phases. Phase 2 will include levee/wall construction near the lower end of the plant. Underground piping will b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Austin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
