WWTP Outfall Rehabilitation
Construction · British Columbia · Last reported Mar 2024
Source: Dodge USA
The scope of work for this Project will include all labour, supervision, equipment, and materials necessary to complete repairs to the Wastewater Treatment Plant outfall and construction of the outfall armoring in accordance with the specifications, locations, and conceptual design drawings (refer to Appendix 4 D2) specified in this RFPQ.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Chilliwack, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Outfall Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for this Project will include all labour, supervision, equipment, and materials necessary to complete repairs to the Wastewater Treatment Plant outfall and construction of the outfall armoring in accordance with the specifications, locations, and conceptual design drawings (refer to Appendix 4 D2) specified in this RFPQ. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Chilliwack |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
