logo

WWTP Screen Building Make-Up Air Unit Replacement

Sector: Commercial • Location: Sidney, Ohio, United States of America

Source: Dodge USA

Project
Closed

The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units

Status
Closed
Sector
Commercial, Waste Processing and Treatment, Government, Water Supply and Storage
Location
Sidney, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WWTP Screen Building Make-Up Air Unit Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WWTP Screen Building Make-Up Air Unit Replacement” is an infrastructure initiative in the Commercial sector, located in Sidney, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Sidney

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Waste Processing and Treatment, Government, Water Supply and Storage

Article published date

2024-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project