WWTP Solids Handling Facility and Administration Building
Sector: Water Supply and Storage • Location: Greenville, Ohio, United States of America
Source: Dodge USA
In general, the work consists of below: 1. The proposed solids handling improvements include: a. Three aerobic digesters. Some of the major process equipment includes submersible pumps one/tank), and coarse bubble diffuser systems (one/tank). b. Solids Handling Building with process, electrical and HVAC equipment. Some of the major process equipment include blowers, sludge storage day tank, two pr
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Manufacturing (Industrial)
- Location
- Greenville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WWTP Solids Handling Facility and Administration Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of below: 1. The proposed solids handling improvements include: a. Three aerobic digesters. Some of the major process equipment includes submersible pumps one/tank), and coarse bubble diffuser systems (one/tank). b. Solids Handling Building with process, electrical and HVAC equipment. Some of the major process equipment include blowers, sludge storage day tank, two progressive cavity pumps, solids dewatering press, booster pumps and polymer system. c. Biosolids S... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Greenville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Power Generation (CCGT), Chemical (Industrial), Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
