Xacbal Hydroelectric Plant
One of 2,534 projects Taiyo tracks in Guatemala.
Source: World Bank Group
In 2006, Hidro Xacbal SA began constructing the Xacbal Hydroelectric Plant, a 94 MW merchant hydroelectric plant next to the Xalbal River in municipality of Chajul, department of Quiche in the northern region of Guatemala. Included in the project was a transmission line that was to connect to SIEPAC, the transmission system for Central American and Mexico that was slated for completion in 2008. Th
- Status
- Prospective
- Sector
- Automotive, Government, Hydro, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Guatemala
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Xacbal Hydroelectric Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2006, Hidro Xacbal SA began constructing the Xacbal Hydroelectric Plant, a 94 MW merchant hydroelectric plant next to the Xalbal River in municipality of Chajul, department of Quiche in the northern region of Guatemala. Included in the project was a transmission line that was to connect to SIEPAC, the transmission system for Central American and Mexico that was slated for completion in 2008. The electricity from Xacbal would would be freely sold to the main electricity grid of Guatemala. Hidro Xacbal SA was formed as a special purpose vehicle for the project and was controlled by Grupo Terra (100%, Honduras).Government authorization for the project was obtained through direct negotiation. The project had an estimated cost of US $226.8 million and was to be financed with a debt to equity ratio of 3:1. In March 2007, a team of banks led by Royal Bank of Trinidad & Tobago (RBTT) arranged a US $167.4 million syndication. The other syndicators included FMO with US $30 million, G&T Continental Bank with US $15 million, the Central American Bank for Economic Integration (BCIE) with US $90 million and Banco Agromericantil. The loan had a term of 15 years which was considered very favorable for Central America at the time. Although the project was conceivable eligible for carbon credits, they were not an important part of its financing. The Xacbal Hydroelectric Plant became operational in August 2010. |
Original sector | Energy |
Budget |
Location
Country | Guatemala |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Government, Hydro, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
