logo

xAI Data Center in Boxtown

Under construction · Tennessee · Last reported Jan 2024

Source: Word In Black

Project
Under Construction

Elon Musk's company xAI built the largest AI data center on the planet in Boxtown, Memphis, Tennessee. The data center uses methane-fueled turbines for power, which increased local air pollution significantly. There are plans to build an even bigger data center nearby. The project was pushed through local approval processes rapidly, in 122 days, with local utility unable to supply sufficient elect

Status
Under Construction
Sector
Power Transmission, Data Center, Power Generation (CCGT), Natural Gas
Location
Memphis, Tennessee, United States of America
Updated
22 Jul 2026
Source
Word In Black

ConstructChat

Ask ConstructChat about xAI Data Center in Boxtown

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “xAI Data Center in Boxtown” is an infrastructure initiative in the Power Transmission sector, located in Memphis, Tennessee, United States. Taiyo aggregates data on it from Word In Black.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Elon Musk's company xAI built the largest AI data center on the planet in Boxtown, Memphis, Tennessee. The data center uses methane-fueled turbines for power, which increased local air pollution significantly. There are plans to build an even bigger data center nearby. The project was pushed through local approval processes rapidly, in 122 days, with local utility unable to supply sufficient electricity, leading to the use of gas turbines without proper permitting.

Original sector

Technology

Location

Country

United States of America (USA)

State

Tennessee

City

Memphis

Source

Source

Word In Black

URL

More Details

Record type

Project

Sector

Power Transmission, Data Center, Power Generation (CCGT), Natural Gas

Article published date

2025-11-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project