xAI Tulane Road Facility Power Infrastructure Expansion
Sector: Road • Location: Memphis, Tennessee, United States
Source: The Commercial Appeal
The Tulane Road facility, also known as Colossus 2, is planned to be a gigawatt-scale data center facility in Memphis. It will use at least 168 Tesla Megapacks and requires significant power infrastructure, including power transformers from Hyosung HICO. The facility is expected to be active within six to nine months, but permanent infrastructure is still under construction.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Tulane Road facility, also known as Colossus 2, is planned to be a gigawatt-scale data center facility in Memphis. It will use at least 168 Tesla Megapacks and requires significant power infrastructure, including power transformers from Hyosung HICO. The facility is expected to be active within six to nine months, but permanent infrastructure is still under construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
