Xavantina Small Hydro Power Plant
One of 10,000+ projects Taiyo tracks in Brazil.
Source: World Bank Group
In March 2010, the Brazilian company Xavantina Energetica S.A. (Celesc Geracao S.A.– 40% and Ritmo Energia S.A. – 60%) was granted the 30-year contract to build and operate the Xavantina Small Hydro Power Plant (6.07 MW total capacity), located between the municipalities of Xavantina e Xanxere, state of Santa Catarina (Irani River). The power plant was named PCH Xavantina.
In August 2015, the com
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Hydro, Steel, Government, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Xavantina Small Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In March 2010, the Brazilian company Xavantina Energetica S.A. (Celesc Geracao S.A.– 40% and Ritmo Energia S.A. – 60%) was granted the 30-year contract to build and operate the Xavantina Small Hydro Power Plant (6.07 MW total capacity), located between the municipalities of Xavantina e Xanxere, state of Santa Catarina (Irani River). The power plant was named PCH Xavantina. In August 2015, the company was granted power purchase agreements to sell electricity to distribution companies starting in 2018. The company presented a winning bid of US$ 60.8/MWh (BRL 202,85/MWh). The investment committed to the power plant was estimated at US$ 20.5 million (BRL 40 million). Construction works began in April 2014, and commercial operations commenced in September 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Hydro, Steel, Government, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia