logo

Xiangyin County Domestic Waste Incineration Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project involves the the construction of the domestic garbage treatment project in Xiangyin County, in Tufeng Village, northeast of Xiangyin County of China. The project includes two 300-ton / day domestic garbage treatment incineration production lines, an annual treatment of 219,000 tons of domestic garbage, and two 300-ton / day mechanical grate furnaces and a 15MW steam turbine generator

Project Information FAQ

Project Information

5 Q
The project “Xiangyin County Domestic Waste Incineration Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the the construction of the domestic garbage treatment project in Xiangyin County, in Tufeng Village, northeast of Xiangyin County of China. The project includes two 300-ton / day domestic garbage treatment incineration production lines, an annual treatment of 219,000 tons of domestic garbage, and two 300-ton / day mechanical grate furnaces and a 15MW steam turbine generator set. Other supporting facilities include a flue gas purification system for each waste incineration production line; waste heat boilers; supporting auxiliary production and environmental protection facilities. The SPV is called Everbright Modern Environmental Energy (Xiangyin) Co., Ltd. and is owned by China Everbright International with 70% stake and Hunan Modern Environment with 30% stake. The total cost amounts to CNY131.03 million or $19.06 million. The project is structured under TOT + BOT model for a concession period of 30 years. Financial close was reached in July 2019.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data