Xiangyin County Domestic Waste Incineration Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the the construction of the domestic garbage treatment project in Xiangyin County, in Tufeng Village, northeast of Xiangyin County of China. The project includes two 300-ton / day domestic garbage treatment incineration production lines, an annual treatment of 219,000 tons of domestic garbage, and two 300-ton / day mechanical grate furnaces and a 15MW steam turbine generator
- Status
- Prospective
- Sector
- Biomass, Wind, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Xiangyin County Domestic Waste Incineration Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the the construction of the domestic garbage treatment project in Xiangyin County, in Tufeng Village, northeast of Xiangyin County of China. The project includes two 300-ton / day domestic garbage treatment incineration production lines, an annual treatment of 219,000 tons of domestic garbage, and two 300-ton / day mechanical grate furnaces and a 15MW steam turbine generator set. Other supporting facilities include a flue gas purification system for each waste incineration production line; waste heat boilers; supporting auxiliary production and environmental protection facilities. The SPV is called Everbright Modern Environmental Energy (Xiangyin) Co., Ltd. and is owned by China Everbright International with 70% stake and Hunan Modern Environment with 30% stake. The total cost amounts to CNY131.03 million or $19.06 million. The project is structured under TOT + BOT model for a concession period of 30 years. Financial close was reached in July 2019. |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Wind, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
