logo

Xiao Shun Jiang Water Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Cancelled

In January of 2001, China Water Company (CWC) won a concession contract for Shaoxing China Water Company to construct, operate and manage the water treatment plant and related facilities of the Xiao Shun Jiang Water Supply Scheme located in Shaoxing city, Zhejiang province. The project consisted of four parts 1) the Tangpu reservoir with a storage capacity of 200 million cubic meters, 2) a Pump S

Project Information FAQ

Project Information

4 Q
The project “Xiao Shun Jiang Water Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In January of 2001, China Water Company (CWC) won a concession contract for Shaoxing China Water Company to construct, operate and manage the water treatment plant and related facilities of the Xiao Shun Jiang Water Supply Scheme located in Shaoxing city, Zhejiang province. The project consisted of four parts 1) the Tangpu reservoir with a storage capacity of 200 million cubic meters, 2) a Pump Station, regulating pond and a 13.6 km water transmission tunnel which connects the reservoir and water treatment plant, 3) a plant which treats 400,000 tonnes of water per day. CWC’s share in the project was 40% with the remainder with Shaoxing Municipal Water Group. As of 2002, CWC itself was owned by Thames Water (a subsidiary of RWE) (48.8%) and Sime Darby Bhd. of Malaysia (33.3%). The water treatment plant was built at a cost of US$26 million. Construction began in December 1998 and the plant was commissioned in early 2001. Because of conflicts in profit sharing, Shaoxing Municipal Water Group bought back all the shares of CWC with compensating it for its investment and interest in 2006. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data