Xiayi Integrated Biomass and Waste-to-Energy Projects
Sector: Water Supply and Storage • Location: China
Source: InfraPPPWorld
Xiayi Integrated Biomass and Waste-to-Energy Projects is the first biomass and waste-to-energy integration project in Henan Province.Xiayi Integrated Biomass and Waste-to-Energy Project (Biomass) will be constructed on a BOO (Build-Operate-Own) model and Xiayi Integrated Biomass and Waste-to-Energy Project (Waste-to-Energy) will be constructed on a BOT (Build-Operate-Transfer) model for a concessi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project signed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Xiayi Integrated Biomass and Waste-to-Energy Projects is the first biomass and waste-to-energy integration project in Henan Province.Xiayi Integrated Biomass and Waste-to-Energy Project (Biomass) will be constructed on a BOO (Build-Operate-Own) model and Xiayi Integrated Biomass and Waste-to-Energy Project (Waste-to-Energy) will be constructed on a BOT (Build-Operate-Transfer) model for a concession period of 30 years.Xiayi Integrated Biomass and Waste-to-Energy Project (Biomass), with an investment of approximately CNY228 million, is designed to have a biomass material processing designed capacity of 150,000 tonnes per annum and is expected to generate approximately 110,000,000 kWh of green electricity annually. The project will be equipped with a 75t/h furnace and a 15 MW turbine power generator.Meanwhile, Xiayi Integrated Biomass and Waste-to-Energy Project (Waste-to-Energy), with an investment of approximately CNY230 million, has a designed daily household waste processing capacity of 400 tonnes. Gas emissions will fully comply with the Euro 2010 Standard and is expected to generate 46,000,000 kWh of green electricity annually. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
