The Xiluodu Dam is the second biggest dam in China. Image: courtesy of Vacon. Xiluodu Dam was constructed along the Jinsha River on the upper reaches of the Yangtze River. Image courtesy of Vacon. The fixed hoist headstock gears used for operating the gates of the dam are controlled by Vacon AC drives. Image courtesy of Vacon. The Putzmeister belt conveyor Telebelt TB 110G was used for laying conc

Project Information FAQ

Project Information

4 Q
The project “Xiluodu Dam, Jinsha River, China” is an infrastructure initiative in the Cement sector, located in World. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Xiluodu Dam is the second biggest dam in China. Image: courtesy of Vacon. Xiluodu Dam was constructed along the Jinsha River on the upper reaches of the Yangtze River. Image courtesy of Vacon. The fixed hoist headstock gears used for operating the gates of the dam are controlled by Vacon AC drives. Image courtesy of Vacon. The Putzmeister belt conveyor Telebelt TB 110G was used for laying concrete for the Xiluodu Dam. Image courtesy of Putzmeister. The construction site of Xiluodu Dam. Image courtesy of Putzmeister. The Xiluodu double-curvature arch dam was built by China Three Gorges Corporation (CTGPC). It is the second largest dam in China, next only to the Three Gorges Dam (TGD) in terms of size, construction cost and generating capacity. The new dam was constructed in the lower Jinsha River, which is a major tributary of the Yangtze River. The dam is located on the upper reaches of the Yangtze River between Yunnan Province and Sichuan Province. Construction of the CNY50.34bn ($6.2bn) dam project began in December 2005, with the concreting commencing in 2008. Construction of the dam was completed in 2013. With a reservoir capacity of 12.67 billion cubic metre (bcm) and flood control capacity of 4.65bcm, the Xiluodu Dam and TGD is capable of preventing floods up to 4.6bcm in the middle and lower parts of the Yangtze. As well as alleviating the control of flooding on the Yangtze River, the Xiluodu Dam project also generates power. In addition, it helps with flood prevention, sediment control and navigation improvement. The new dam complements the TGD and helps ease sediment collection in the reservoir. It also improves navigation system downstream. The dam was built as part of the China West Development Strategy, which aims to boost the economy of six provinces, five autonomous regions and one municipality in Western China. CTGPC is currently constructing two other dams, Baihetan and Wudongde, which are also located on the Jinsha River. The overall elevation of the dam crest is 600m, with the concrete double-curvature arch being 285.5m high and 700m long. Up to 16.72m3 of concrete was used for constructing the dam, which comprises of seven surface spillways and eight outlets. There are four overflow tunnels, two each on the left and right banks. The reservoir capacity is about 12.67bcm, with 4.65bcm utilised for flood control. The dam generates power from two underground power stations, one on the right bank and one on the left. The two stations are equipped with nine turbines each with an overall power generation capacity of 12.6GW. The Jinsha River was dammed using five control gates in November 2007, with the area of the dammed part measuring 47m wide and the flow of water at 7m a second. Four of the five control gates weigh 1,200t each, while one control gate weighs 1,600t. The construction of the dam was carried out using belt conveyors, crawler tractors, hydraulic excavators, rock trucks and wheel loaders. The construction of Xiluodu Dam began in December 2005 after being halted temporarily by the State Environmental Protection Administration (SEPA) in January 2005 due to the lack of a satisfactory environmental impact assessment. The project site is located in a rare fish reserve and earthquake-prone area and required preservation measures to obtain the permit for construction. In 2009, it was decided that the dam’s height should be increased to 285.5m, which resulted in design changes and escalated the construction cost by around $250m. It also required the generation of about CNY10m in unauthorised funds. The project is said to have relocated about 7,300 people and is expected to displace about 50,000 people in the long-term. The dam’s design was provided by the Chengdu Hydroelectric Investigation Design & Research Institute of State Power Company (CHIDI). Ansys played crucial roles in studying the dam’s feasibility. The financiers for the project included Yangtze Power, China Development Bank (CDB) and China Construction Bank. Citic Heavy Machinery supplied the headstock gears used for operating the gates at the dammed area of Jinsha River, while Vacon provided 20 NXP drive units for powering the headstock gears. Belt conveyors for the laying of concrete were supplied by Putzmeister. The belt conveyer used for the project is the Telebelt TB 110G.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data