Xiluodu Dam
The status, timeline and source of this project. A free account opens every field.
Source: Zee News
The Xiluodu dam is one of the world’s tallest arch dams at 285.5 metres, built between 2005 and 2013 along the Jinsha river. It has a reservoir storing over 12 billion cubic metres of water, improving river management across the Yangtze basin and reducing sediment pressure on the Three Gorges dam downstream. The construction cost was more than CNY 50 billion.
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Zee News
ConstructChat
Ask ConstructChat about Xiluodu Dam
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Xiluodu dam is one of the world’s tallest arch dams at 285.5 metres, built between 2005 and 2013 along the Jinsha river. It has a reservoir storing over 12 billion cubic metres of water, improving river management across the Yangtze basin and reducing sediment pressure on the Three Gorges dam downstream. The construction cost was more than CNY 50 billion. |
Original sector | Energy |
Budget |
Location
Country | China |
Source
Source | Zee News |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2025-12-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
