Xingo – Campina Grande Transmission Line

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

The project comprised building and operating two transmission lines for a period of 30 years. The first 500Kv line connected Xingo substation in the State of Sergipe to Angelim substation in the State of Pernambuco (200 Km). The second 230Kv line connected Angelim substation to Campina Grande, in the state of Paraiba (186 Km). The company responsible for the project, Nordeste Transmissora de Energ

Status
Prospective
Sector
Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Xingo – Campina Grande Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Xingo – Campina Grande Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprised building and operating two transmission lines for a period of 30 years. The first 500Kv line connected Xingo substation in the State of Sergipe to Angelim substation in the State of Pernambuco (200 Km). The second 230Kv line connected Angelim substation to Campina Grande, in the state of Paraiba (186 Km). The company responsible for the project, Nordeste Transmissora de Energia (NTE), was held by Abengoa Brasil, Instalaciones Inabensa and Dragados Industrial. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered through public bid the concession for the lines in September 28, 2001. The Spanish company Inabensa was the winner. In 2002, 49.9% of the shares of Inabensa Brasil were transferred from the Spanish Instalaciones Inabensa (Abengoa) to Dragados Industrial (part of ACS Group as of December 2003). In 2003, Nordeste Transmissora de Energia (NTE) was created as the JV company responcible for the project. The contract between ANEEL and Inabensa was signed in January 2002. According to the contract, the lines were to start operating within 24 months of signature. In April 2004, NTE inaugurated the line. The project reached financial closure in August 2003, when Brazil’s development Bank approved a financing of US$82.1 million (R$238.6 million) for the project. The total investment in the project was expected to be R$340.9 million (US$117.3 million). The project was expected to expand distribution in the Northeast region of Brazil by up to 3,000 MW. It was also expected to integrate the North/Northeast and South/Southeast/Center-West systems. The Xingo-Angelim line linked 17 cities while Angelim-Campina Grande line linked 16 municipalities. None None

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project