Active

The project comprised building and operating two transmission lines for a period of 30 years. The first 500Kv line connected Xingo substation in the State of Sergipe to Angelim substation in the State of Pernambuco (200 Km). The second 230Kv line connected Angelim substation to Campina Grande, in the state of Paraiba (186 Km). The company responsible for the project, Nordeste Transmissora de Energ

Project Information FAQ

Project Information

4 Q
The project “Xingo – Campina Grande Transmission Line” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprised building and operating two transmission lines for a period of 30 years. The first 500Kv line connected Xingo substation in the State of Sergipe to Angelim substation in the State of Pernambuco (200 Km). The second 230Kv line connected Angelim substation to Campina Grande, in the state of Paraiba (186 Km). The company responsible for the project, Nordeste Transmissora de Energia (NTE), was held by Abengoa Brasil, Instalaciones Inabensa and Dragados Industrial. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered through public bid the concession for the lines in September 28, 2001. The Spanish company Inabensa was the winner. In 2002, 49.9% of the shares of Inabensa Brasil were transferred from the Spanish Instalaciones Inabensa (Abengoa) to Dragados Industrial (part of ACS Group as of December 2003). In 2003, Nordeste Transmissora de Energia (NTE) was created as the JV company responcible for the project. The contract between ANEEL and Inabensa was signed in January 2002. According to the contract, the lines were to start operating within 24 months of signature. In April 2004, NTE inaugurated the line. The project reached financial closure in August 2003, when Brazil’s development Bank approved a financing of US$82.1 million (R$238.6 million) for the project. The total investment in the project was expected to be R$340.9 million (US$117.3 million). The project was expected to expand distribution in the Northeast region of Brazil by up to 3,000 MW. It was also expected to integrate the North/Northeast and South/Southeast/Center-West systems. The Xingo-Angelim line linked 17 cities while Angelim-Campina Grande line linked 16 municipalities. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data