Xinhua Waste-to-energy Plant Phase I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the construction of phase I of Xinhua Waste-to-energy plant, located in Xinhua, Hunan province of China. Phase I of the project has a designed daily waste processing capacity of 700 tonnes (255,500 tonnes/year). The 2nd phase will add further 350 tonnes/day to the capacity. Phase I will be equipped with two 350 tonnes/day mechanical grate furnaces and one 15 MW steam turbine p
- Status
- Prospective
- Sector
- Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Xinhua Waste-to-energy Plant Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of phase I of Xinhua Waste-to-energy plant, located in Xinhua, Hunan province of China. Phase I of the project has a designed daily waste processing capacity of 700 tonnes (255,500 tonnes/year). The 2nd phase will add further 350 tonnes/day to the capacity. Phase I will be equipped with two 350 tonnes/day mechanical grate furnaces and one 15 MW steam turbine power generator. The project is expected to generate approximately 69 million kWh of green electricity per year. The sponsor China Everbright international Ltd signed a concession agreement for 30 years, including the construction. The project cost is approximately CNY 588 million or $ 85.49 million. Financial close was reached on 15 May 2019. https://www.ebchinaintl.com/en/media/news_content-p190515.html |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
