Xnergy Facility Office/Warehouse Ph 2
Sector: Commercial • Location: Mesa, Arizona, United States of America
Source: Dodge USA
The Development Will Include An Approximately 252,000 Factory Building. Includes Overhead Cranes Supported By Structural Columns Which Assist In Moving Product Down The Assembly Line. The Site Includes 316 Parking Stalls, Required Landscaping, Storm Water Storage And Screening. The Building Is Tilt Wall Construction With Metal Framing And Glazing At The Office Building. The Design Is Targeting Lee
- Status
- Prospective
- Sector
- Commercial, Metal, Warehouse, Car parking, Residential, Water Supply and Storage, Manufacturing (Industrial), Automotive, Cement
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Xnergy Facility Office/Warehouse Ph 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Development Will Include An Approximately 252,000 Factory Building. Includes Overhead Cranes Supported By Structural Columns Which Assist In Moving Product Down The Assembly Line. The Site Includes 316 Parking Stalls, Required Landscaping, Storm Water Storage And Screening. The Building Is Tilt Wall Construction With Metal Framing And Glazing At The Office Building. The Design Is Targeting Leed Certified Certification, Which Includes Natural Materials, Local Sourcing, And Low-Water Use. D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Warehouse, Car parking, Residential, Water Supply and Storage, Manufacturing (Industrial), Automotive, Cement |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
