logo

XSD Malaysia

Sector: Water Supply and Storage • Location: Malaysia

Source: International Finance Corporation (IFC)

Project
Active

 XSD International Paper SDN. BHD (“XSD” or the “Company”), founded in 2018, is a leading coated duplex board and grey board manufacturer in Malaysia which uses recycled material as raw material.  XSD commenced production in March 2022 and currently operates one production line for coated duplex board with a designed capacity of 350,000 tons per annum (TPA). A second production line for grey board

Project Information FAQ

Project Information

5 Q
The project “XSD Malaysia” is an infrastructure initiative in the Water Supply and Storage sector, located in Malaysia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

 XSD International Paper SDN. BHD (“XSD” or the “Company”), founded in 2018, is a leading coated duplex board and grey board manufacturer in Malaysia which uses recycled material as raw material.  XSD commenced production in March 2022 and currently operates one production line for coated duplex board with a designed capacity of 350,000 tons per annum (TPA). A second production line for grey board, with a capacity of 150,000 TPA, is under construction and is expected to be commissioned by 2Q25 (i.e. the period from April 1 to June 30, 2025).IFC’s proposal consists of an up to US$70 million Senior Secured A-Loan to XSD. IFC’s proceeds are expected to support the Company for the development of: (i) a biomass cogeneration plant to generate electricity and steam; and (ii) a third production line for duplex board paper with a capacity of 300,000 TPA. The construction of the cogeneration plant is ongoing and the commissioning of the same is expected in 2Q25. The construction of the third production line for coated duplex board is anticipated to commence at the end of 2025 and get completed by 1Q27.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data