YACYRETA HYDROELECTR
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Yacyreta Hydroelectric Project are to provide least-cost base-load electric energy, to improve navigation on the Parana River, to facilitate future irrigation projects in both Argentine and Paraguayan territories, and to develop fishery. The continued Bank involvement in the Argentine energy sector through the project will help improve sector organization, management, tariff
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about YACYRETA HYDROELECTR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Yacyreta Hydroelectric Project are to provide least-cost base-load electric energy, to improve navigation on the Parana River, to facilitate future irrigation projects in both Argentine and Paraguayan territories, and to develop fishery. The continued Bank involvement in the Argentine energy sector through the project will help improve sector organization, management, tariff policies, and investment planning for generation and transmission facilities. The Yacyreta Hydroelectric Project consists of (a) 70 km of earth dam; (b) a power house with 20 units each of 135 MW capacity to be installed between 1986-90 and intake structures for 10 additional units; (c) an avigation lock; (d) fish passage facilities; (e) irrigation intakes and Aguapey, Tacuary, Caragueta and San Martin dikes to prevent flooding; (f) ancillary works including housing for personnel during and after construction; (g) relocation of infrastructure and resettlement of a total of about 33,000 people on both banks of the river; and (h) Argentine power sector studies on transmission system and small hydroelectric plants. The project will benefit the Argentine population at large by supplying electricity for the continued economic development of the country and provide substantial earnings for Paraguay through royalty payments. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Argentina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
