Yadana Gas Pipeline
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Yadana Gas Pipeline is a 617 km submarine gas pipeline, with an estimated cost of US$1034.0 million. A consortium led by TotalFina (France) is building the 320 km, US$394.0 million Yadana Gas Pipeline from the Yadana offshore gas field in the Gulf of Matarban in Myanmar to Ban I Thong on the Thai-Myanmar border. The Yadana consortium is held by operator TotalFina SA (31.24%), Unocal Corp. (28.
- Status
- Prospective
- Sector
- Commercial, Natural Gas, Oil and Gas, Power Generation (CCGT), Government
- Location
- Myanmar (Burma)
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Yadana Gas Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Yadana Gas Pipeline is a 617 km submarine gas pipeline, with an estimated cost of US$1034.0 million. A consortium led by TotalFina (France) is building the 320 km, US$394.0 million Yadana Gas Pipeline from the Yadana offshore gas field in the Gulf of Matarban in Myanmar to Ban I Thong on the Thai-Myanmar border. The Yadana consortium is held by operator TotalFina SA (31.24%), Unocal Corp. (28.26%), Thai state oil company PTT Exploration & Production (25.5%), and state-owned Myanma Oil & Gas Enterprise (15%). The state-owned Petroleum Authority of Thailand (PTT) would build the a 297km, US$640 million gas section that connects from Ban I Thong to the 4600MW power plant in Ratchaburi, near Bankgok, operated by the Electricity Generating Authority of Thailand (EGAT). Construction on the pipeline has begun on the Myanmar side. A 30-year PPA between PTT and the Yadana consortium was signed in Febuary 1995. Financial closure was believed to have occurred during 1995. As of February 2000, construction works are almost completed, and commercial operations were expected for April 2000. |
Original sector | Energy |
Budget |
Location
Country | Myanmar (Burma) |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Natural Gas, Oil and Gas, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project