Yakima River Rm 89.5 Floodplain Restoration
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Yakima River RM 89.5 Floodplain Restoration Excavate approximately 8,715 feet of new channel across 9 sections (alignments) of side channels within the Yakima River floodplain. Install two Large Wood Structures (LWD) at one location on the Yakima River. Re-vegetate through seeding and tree and shrub planting 21.5 acres. Transport and stabilize approximately 25,610 cubic yards of spoils material fr
- Status
- Closed
- Sector
- Consumer Products, Government, Manufacturing (Industrial), Commercial
- Location
- Toppenish, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Yakima River Rm 89.5 Floodplain Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Yakima River RM 89.5 Floodplain Restoration Excavate approximately 8,715 feet of new channel across 9 sections (alignments) of side channels within the Yakima River floodplain. Install two Large Wood Structures (LWD) at one location on the Yakima River. Re-vegetate through seeding and tree and shrub planting 21.5 acres. Transport and stabilize approximately 25,610 cubic yards of spoils material from channel excavation to one off-site disposal area. Transport and stabilize spoils material from... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Toppenish |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
