Yala Power Project
Sector: Raw Materials • Location: Thailand
Source: World Bank Group
Gulf Yala Green Company Limited (GYG) was developing the Yala Power Project, a parawood- fueled biomass power plant, with 20.2-MW installed capacity, in Lam Mai Subdistrict, Muang District, Yala Province. This 1.5 billion baht (US$36 million) project signed a power purchase agreement with the state-owned utility Electricity Generating Authority of Thailand (EGAT) in June of 2003. Yala Power was on
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Gulf Yala Green Company Limited (GYG) was developing the Yala Power Project, a parawood- fueled biomass power plant, with 20.2-MW installed capacity, in Lam Mai Subdistrict, Muang District, Yala Province. This 1.5 billion baht (US$36 million) project signed a power purchase agreement with the state-owned utility Electricity Generating Authority of Thailand (EGAT) in June of 2003. Yala Power was one of 14 pilot projects initiated and supported by the Office of Energy Policy and Planning, aimed at encouraging the utilization of agricultural waste to produce power. GYG was 95% owned by Gulf Electric Public Company Limited (GEC), a joint venture between partially divested Electricity Generating Company (EGCO) of Thailand (50%), Japan Electric Power Development Company Limited (EPDC or J-POWER) (49%) and Mit Siam (1%). The other 5% of the project was owned by Asia Plywood Company Limited. As of 2004, the stake holders of EGCO were EGAT (25.41%), CLP Power (22.42%), Thai investors (30.09%), and foreign investors (22.08%). As for the 1.5 billion baht investment budget, 1.05 billion was derived from a loan from the Bank of Ayudhya, while the remaining 450 million baht came from shareholders. The loan agreement was signed May 2003 and GYG had a first draw down of debt on August 28, 2003. This power plant had also been selected to receive financial support from the government's Renewable SPP Program. As of end 2003, GYG had finished land filling and begun the construction. Progress was delayed however, and construction was suspended for 6 months in April 2005 following unrest in the southern border provinces. Construction was expected to be completed by September 2006. None None |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in Thailand
- JC Wilt Infectious Diseases Research Centre, Winnipeg
- Bioniche Life Sciences’ Vaccine Manufacturing Facility, Belleville, Ontario
- Cambridge Major Laboratories New Active Pharmaceutical Ingredient (API) Facility
- Kyabram / Shepparton Water Improvement Scheme
- Grand Ethiopian Renaissance Dam Project, Benishangul-Gumuz
- Shuweihat
- Seymour
- City of North Las Vegas Water Reclamation Facility
