Yanango - Chimay Power Project
Sector: Cable car • Location: Junin, Peru
Source: World Bank Group
The project is being developed by Edegel (60%) and Perene (40%). Edegel is a generating utility which was privatized in 1995. The project involves the construction and operation of two hydro power units and a transmission line. The first phase of the project consisted of the construction of the Yanango plant, which involved US$ 60 million in investment financed with the companies own resources. Th
- Status
- Prospective
- Sector
- Cable car, Hydro, Power Transmission, Power Generation (CCGT), Automotive, Telecommunications, Government
- Location
- Junin, Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Yanango - Chimay Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is being developed by Edegel (60%) and Perene (40%). Edegel is a generating utility which was privatized in 1995. The project involves the construction and operation of two hydro power units and a transmission line. The first phase of the project consisted of the construction of the Yanango plant, which involved US$ 60 million in investment financed with the companies own resources. The Yanango unit has a capacity of 40 MW and commenced operations in early 2000. The second phase of the project involved the construction of the 141-MW Chimay unit. Works on this unit started in 2000 and the US$ 140 million investment was financed with bond issuances. The project also envisages the construction of a 120-KM transmission line linking Chimay and Yanango to the Pachachaca substation which is connected to the SICN. |
Original sector | Energy |
Budget |
Location
Country | Peru |
State | Junin |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Cable car, Hydro, Power Transmission, Power Generation (CCGT), Automotive, Telecommunications, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
