Yanbu Battery Anode Material Facility
Sector: Energy Storage • Location: Yanbu, Saudi Arabia
Source: ChemAnalyst
Northern Graphite plans to build a battery anode material production facility in Yanbu, Saudi Arabia, as the first of three planned facilities. The plant is forecast to start production in 2028 with an initial capacity of 25,000 tonnes per year. The project aims to produce battery anode material from natural graphite to support EVs and clean energy applications.
- Status
- Prospective
- Sector
- Energy Storage, Commercial
- Location
- Yanbu, Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- ChemAnalyst
ConstructChat
Ask ConstructChat about Yanbu Battery Anode Material Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Northern Graphite plans to build a battery anode material production facility in Yanbu, Saudi Arabia, as the first of three planned facilities. The plant is forecast to start production in 2028 with an initial capacity of 25,000 tonnes per year. The project aims to produce battery anode material from natural graphite to support EVs and clean energy applications. |
Original sector | Energy Transition |
Location
Country | Saudi Arabia |
City | Yanbu |
Source
Source | ChemAnalyst |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Saudi Arabia
- Ras Tanura Refinery Expansion
- توريد و تركيب مستلزمات استديو التصوير التليفزيوني
- Battery Energy Storage System Projects in Tabuk and Hail
- Amaala Luxury Resort Off-Grid Renewable Facility
- Al Baitha Bauxite Mine 8 MW Solar Power Project
- AlUla Tram Project
- 18 GWh BESS Factory
- Saudi Arabia-Bahrain 2.8GW Solar PV Plant with Co-located BESS
