logo
ProjectClosed

Yancheng Hazardous Solid Waste Landfill Project

Closed · China

Source: InfraPPPWorld

The project will be constructed on a BOO model, with a designed storage capacity of 158,000 m3. Phase I of the project will have a designed storage capacity of 30,000 m3and a designed annual processing capacity of 10,000 tonnes of industrial waste containing high salt content

Status
Closed
Sector
Biomass, Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage
Location
China
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Yancheng Hazardous Solid Waste Landfill Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Yancheng Hazardous Solid Waste Landfill Project” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will be constructed on a BOO model, with a designed storage capacity of 158,000 m3. Phase I of the project will have a designed storage capacity of 30,000 m3and a designed annual processing capacity of 10,000 tonnes of industrial waste containing high salt content

Original sector

Water & Waste

Location

Country

China

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Biomass, Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project