Yangon Elevated Expressway (YEX) PPP project Phase 1
One of 40 projects Taiyo tracks in Myanmar (Burma).
Source: InfraPPPWorld
The project involves the design, engineering, financing, construction, operation and maintenance of a 27.5-kilometer elevated toll road in Yangon, the largest city in Myanmar. The road is the first phase of a planned 47.5km expressway.The four-lane expressway is proposed to be implemented on an elevated viaduct above existing roadways to connect Yangon's CBD in the south with the Yangon Industrial
- Status
- Under Construction
- Sector
- Mass Transit, Airport, Bridge, Manufacturing (Industrial), Power Generation (CCGT), Rail, Road, Government
- Location
- Myanmar (Burma)
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Yangon Elevated Expressway (YEX) PPP project Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the design, engineering, financing, construction, operation and maintenance of a 27.5-kilometer elevated toll road in Yangon, the largest city in Myanmar. The road is the first phase of a planned 47.5km expressway.The four-lane expressway is proposed to be implemented on an elevated viaduct above existing roadways to connect Yangon's CBD in the south with the Yangon Industrial Park in the north. The expressway will also provide a link to Yangon International Airport. It will go through eight townships of Yangon: Mingalar Taung Nyunt, Tamwe, Thingangyun, South Okkalapa, North Okkalapa, Mayangone, Mingaladon and Insein.Construction will take three and a half years. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Myanmar (Burma) |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Airport, Bridge, Manufacturing (Industrial), Power Generation (CCGT), Rail, Road, Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
