logo

Yangzhou Waste Water Treatment Plant, Phase III

Sector: Government • Location: China

Source: KFW Bank aus Verantwortung

Project
Completed

The project includes the expansion and upgrade of the Liuwei sewage treatment plant (Phase III) in Yangzhou in the eastern Chinese province of Jiangsu. The project will expand and consolidate the existing sewage network in the catchment area of the Liuwei sewage treatment plant and increase the connection rate to the public sewer network. At the same time, the wastewater treatment capacity at the

Project Information FAQ

Project Information

5 Q
The project “Yangzhou Waste Water Treatment Plant, Phase III” is an infrastructure initiative in the Government sector, located in China. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the expansion and upgrade of the Liuwei sewage treatment plant (Phase III) in Yangzhou in the eastern Chinese province of Jiangsu. The project will expand and consolidate the existing sewage network in the catchment area of the Liuwei sewage treatment plant and increase the connection rate to the public sewer network. At the same time, the wastewater treatment capacity at the Liuwei sewage treatment plant will be increased by means of a further expansion stage in order to be able to properly treat the additional wastewater volumes generated by the consolidated sewer network. The wastewater will be treated to such an extent that it can be reused as process water in industry and for irrigating green spaces. The aim here is for 30% of the wastewater volumes generated to be reused as process water. In addition to the KfW Federal Development Fund loan, the financing will be secured from funds from the local government (Yangzhou Municipal Government).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data