YAQUE DEL NORTE IRRI
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would provide full water supply to 27,500 ha by replacing and improving the existing but inadequate irrigation system. The main canal capacity would be adequate to serve 40,000 ha, a feature which would allow for future expansion of the project. Project works would include: (a) headworks on the Yaque del Norte river at Santiago de los Caballeros, consisting of a diversion dam, a sluice
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government
- Location
- Dominican Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about YAQUE DEL NORTE IRRI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide full water supply to 27,500 ha by replacing and improving the existing but inadequate irrigation system. The main canal capacity would be adequate to serve 40,000 ha, a feature which would allow for future expansion of the project. Project works would include: (a) headworks on the Yaque del Norte river at Santiago de los Caballeros, consisting of a diversion dam, a sluice structure, a desilting works and intake structure; (b) a concrete lined main canal of about 73 km; (c) a distribution system of concrete lined canals with a total length of about 300 km; (d) a drainage system of about 500 km, about half of which would consist of reconditioned natural drains; (e) on-farm irrigation and drainage canals and land leveling; (f) a pumping plant to serve about 1,600 ha above the main canal; and (g) about 375 km of roads along the main and secondary canals. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Dominican Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Dominican Republic
- Navarrete Highway Construction Project
- Vehicle Technical Inspection Program
- Construction of highway between Constanza-Padre de las Casas
- Banana plantation - Agriculture project for development in VALVERDE
- Constrution of Amber Highway
- Pedernales-Cabo Rojo: Touristic development - hotels and restaurants construction
- Santo Domingo Puerto Plata Highway
- Boulevard Turístico del Atlántico C. por A.
